• English
  • العربيةُ
  • Español
  • Français
  • Afghanistan
  • Aland Islands
  • Albania
  • Algeria
  • American Samoa
  • Andorra
  • Angola
  • Anguilla
  • Antarctica
  • Antigua and Barbuda
  • Argentina
  • Armenia
  • Aruba
  • Ascension Island
  • Australia
  • Austria
  • Azerbaijan
  • Bahamas
  • Bahrain
  • Bangladesh
  • Barbados
  • Belarus
  • Belgium
  • Belize
  • Benin
  • Bermuda
  • Bhutan
  • Bolivia
  • Bosnia and Herzegovina
  • Botswana
  • Bouvet Island
  • Brazil
  • British Indian Ocean Territory
  • Brunei
  • Bulgaria
  • Burkina Faso
  • Burundi
  • Cambodia
  • Cameroon
  • Canada
  • Cape Verde
  • Cayman Islands
  • Central African Republic
  • Chad
  • Chile
  • China
  • Christmas Island
  • Cocos(Keeling)Islands
  • Colombia
  • Comoros
  • Congo
  • Congo(DRC)
  • Cook Islands
  • Costa Rica
  • Cote d'Ivoire
  • Croatia
  • Cyprus
  • Czech Republic
  • Denmark
  • Djibouti
  • Dominica
  • Dominican Republic
  • Ecuador
  • Egypt
  • El Salvador
  • Equatorial Guinea
  • Eritrea
  • Estonia
  • Ethiopia
  • Falkland Islands
  • Faroe Islands
  • Fiji Islands
  • Finland
  • France
  • French Guiana
  • French Polynesia
  • French Southern and Antarctic Lands
  • Gabon
  • Gambia
  • Georgia
  • Germany
  • Ghana
  • Gibraltar
  • Greece
  • Greenland
  • Grenada
  • Guadeloupe
  • Guam
  • Guatemala
  • Guernsey
  • Guinea
  • Guinea-Bissau
  • Guyana
  • Haiti
  • Heard Island and McDonald Islands
  • Honduras
  • Hong Kong SAR
  • Hungary
  • Iceland
  • India
  • Indonesia
  • Iraq
  • Ireland
  • Isle of Man
  • Israel
  • Italy
  • Jamaica
  • Japan
  • Jersey
  • Jordan
  • Kazakhstan
  • Kenya
  • Kiribati
  • Korea
  • Kuwait
  • Kyrgyzstan
  • Laos
  • Latvia
  • Lebanon
  • Lesotho
  • Liberia
  • Libya
  • Liechtenstein
  • Lithuania
  • Luxembourg
  • Macao SAR
  • Madagascar
  • Malawi
  • Malaysia
  • Maldives
  • Mali
  • Malta
  • Marshall Islands
  • Martinique
  • Mauritania
  • Mauritius
  • Mayotte
  • Mexico
  • Micronesia
  • Moldova
  • Monaco
  • Mongolia
  • Montenegro
  • Montserrat
  • Morocco
  • Mozambique
  • Myanmar
  • Namibia
  • Nauru
  • Nepal
  • Netherlands
  • Netherlands Antilles
  • New Caledonia
  • New Zealand
  • Nicaragua
  • Niger
  • Nigeria
  • Niue
  • Norfolk Island
  • North Macedonia
  • Northern Mariana Islands
  • Norway
  • Oman
  • Pakistan
  • Palau
  • Palestinian Authority
  • Panama
  • Papua New Guinea
  • Paraguay
  • Peru
  • Philippines
  • Pitcairn Islands
  • Poland
  • Portugal
  • Puerto Rico
  • Qatar
  • Reunion
  • Romania
  • Russia
  • Rwanda
  • Samoa
  • San Marino
  • Sao Tome and Principe
  • Saudi Arabia
  • Senegal
  • Serbia
  • Seychelles
  • Sierra Leone
  • Singapore
  • Slovakia
  • Slovenia
  • Solomon Islands
  • Somalia
  • South Africa
  • South Georgia and South Sandwich Islands
  • Spain
  • Sri Lanka
  • St. Martin (French part)
  • St.Helena
  • St.Kitts and Nevis
  • St.Lucia
  • St.Pierre and Miquelon
  • St.Vincent and the Grenadines
  • Sudan
  • Suriname
  • Svalbard and Jan Mayen
  • Swaziland
  • Sweden
  • Switzerland
  • Taiwan
  • Tajikistan
  • Tanzania
  • Thailand
  • Timor-Leste
  • Togo
  • Tokelau
  • Tonga
  • Trinidad and Tobago
  • Tristan da Cunha
  • Tunisia
  • Turkey
  • Turkmenistan
  • Turks and Caicos Islands
  • Tuvalu
  • Uganda
  • Ukraine
  • United Arab Emirates
  • United Kingdom
  • United States
  • United States Minor Outlying Islands
  • Uruguay
  • Uzbekistan
  • Vanuatu
  • Vatican City
  • Venezuela
  • Vietnam
  • Virgin Islands
  • Virgin Islands,British
  • Wallis and Futuna
  • Western Sahara
  • Yemen
  • Zambia
  • Zimbabwe
Request a quote
Request a quote

How does a single lane vehicle control system work?

Where opposing traffic shares one narrow lane, an alternating-flow control system manages when each direction may enter. The site geometry, detection method and operating procedures must be considered together.

HOW IT WORKS
One shared lane. One permitted direction.
A visual explanation of alternating access
One shared lane. One permitted direction.
Illustrative operating state, not a wiring diagram or a timing plan. Actual signals, detection and fault responses require project-specific design.
01 / HOLD

Hold the opposing approach

Only compatible movements may be permitted into the shared section.

02 / CLEAR

Confirm that the lane is clear

Detection, clearance timing and site procedures must account for vehicles still in the section.

03 / RELEASE

Permit the next movement

The next direction receives permission only under the configured control conditions.

Detect demand and monitor the shared section

Detectors can register vehicle approach, entry or exit. Depending on the configuration, the controller may use these inputs to track occupancy. Missed detections, closely following vehicles and intermediate accesses must be considered.

Counting vehicles is not the same as independently proving that the lane is clear. Ask how the proposed system handles inconsistent counts and stopped vehicles.

What to include in a site sketch
What to include in a site sketchABL
Mark both approaches (A and B), the length of the shared section (L), sight lines and every intermediate access. This is a planning sketch, not an installation drawing.

Change direction only under the agreed clearance logic

The controller must apply the project’s clearance conditions before authorising the opposing direction. Travel distance, visibility, queues and possible stops in the shared section affect this assessment.

Do not treat simultaneous green indications at both ends as a general standby rule. Incompatible permissions must be prevented by the specified control logic.

Handle faults and manual intervention

Define the intended behaviour for detection faults, communication loss and power interruption. A reset alone does not prove that the shared lane is empty.

Manual operation and return to automatic control need documented procedures for authorised operators. Confirm these functions and their limits for the actual equipment configuration.

What to supply for a proposal

Send a plan showing lane length and width, gradients, blind spots, all accesses, pedestrian routes and any barriers. Add vehicle types, expected demand and available power.

Before operation, verify the detection, conflicting requests, clearance behaviour and fault handling against the project requirements. Keep the accepted settings and operating instructions for the site team.

Information to send with your enquiry

TopicDetails to confirm
GeometryLane length, width, gradients and blind spots
AccessesEntry, exit, intermediate accesses and pedestrians
DetectionVehicle types, queues and occupancy assessment
OperationClearance conditions, fault handling and manual procedures

Comment

Name
Email
Comment