|
300mm
|
Luminous(cd/m²)
|
Assemblage Parts
|
Emission Color
|
LED Quantity
|
Wavelength(nm)
|
Visual Angle
|
Power Consumption
|
|
|
Left/Right
|
Alow
|
|||||||
|
≥5000
|
Red Arrow
|
Red
|
65(pcs)
|
625±5
|
60
|
30
|
≤9W
|
|
|
≥5000
|
Yellow Arrow
|
Yellow
|
65(pcs)
|
590±5
|
60
|
30
|
≤9W
|
|
|
≥5000
|
Green Arrow
|
Green
|
65(pcs)
|
505±5
|
60
|
30
|
≤8W
|
|



Prepare your inquiry
Include the model, quantity and destination country. Add the intended application, available power supply and installation requirements so we can review the configuration.
What should I confirm before ordering?
- Dimensions and mounting: check the available space and request the drawing for your selected model.
- Power and control: specify the voltage, AC or DC, and the equipment it needs to work with.
- Documentation: identify the standards or certificates required by your project and request documents for the selected model and configuration.
How do I check lead time and delivery?
Include the quantity, destination and required date. Request confirmation of availability, production lead time and shipping terms in your quotation.