• English
  • العربيةُ
  • Español
  • Français
  • Afghanistan
  • Aland Islands
  • Albania
  • Algeria
  • American Samoa
  • Andorra
  • Angola
  • Anguilla
  • Antarctica
  • Antigua and Barbuda
  • Argentina
  • Armenia
  • Aruba
  • Ascension Island
  • Australia
  • Austria
  • Azerbaijan
  • Bahamas
  • Bahrain
  • Bangladesh
  • Barbados
  • Belarus
  • Belgium
  • Belize
  • Benin
  • Bermuda
  • Bhutan
  • Bolivia
  • Bosnia and Herzegovina
  • Botswana
  • Bouvet Island
  • Brazil
  • British Indian Ocean Territory
  • Brunei
  • Bulgaria
  • Burkina Faso
  • Burundi
  • Cambodia
  • Cameroon
  • Canada
  • Cape Verde
  • Cayman Islands
  • Central African Republic
  • Chad
  • Chile
  • China
  • Christmas Island
  • Cocos(Keeling)Islands
  • Colombia
  • Comoros
  • Congo
  • Congo(DRC)
  • Cook Islands
  • Costa Rica
  • Cote d'Ivoire
  • Croatia
  • Cyprus
  • Czech Republic
  • Denmark
  • Djibouti
  • Dominica
  • Dominican Republic
  • Ecuador
  • Egypt
  • El Salvador
  • Equatorial Guinea
  • Eritrea
  • Estonia
  • Ethiopia
  • Falkland Islands
  • Faroe Islands
  • Fiji Islands
  • Finland
  • France
  • French Guiana
  • French Polynesia
  • French Southern and Antarctic Lands
  • Gabon
  • Gambia
  • Georgia
  • Germany
  • Ghana
  • Gibraltar
  • Greece
  • Greenland
  • Grenada
  • Guadeloupe
  • Guam
  • Guatemala
  • Guernsey
  • Guinea
  • Guinea-Bissau
  • Guyana
  • Haiti
  • Heard Island and McDonald Islands
  • Honduras
  • Hong Kong SAR
  • Hungary
  • Iceland
  • India
  • Indonesia
  • Iraq
  • Ireland
  • Isle of Man
  • Israel
  • Italy
  • Jamaica
  • Japan
  • Jersey
  • Jordan
  • Kazakhstan
  • Kenya
  • Kiribati
  • Korea
  • Kuwait
  • Kyrgyzstan
  • Laos
  • Latvia
  • Lebanon
  • Lesotho
  • Liberia
  • Libya
  • Liechtenstein
  • Lithuania
  • Luxembourg
  • Macao SAR
  • Madagascar
  • Malawi
  • Malaysia
  • Maldives
  • Mali
  • Malta
  • Marshall Islands
  • Martinique
  • Mauritania
  • Mauritius
  • Mayotte
  • Mexico
  • Micronesia
  • Moldova
  • Monaco
  • Mongolia
  • Montenegro
  • Montserrat
  • Morocco
  • Mozambique
  • Myanmar
  • Namibia
  • Nauru
  • Nepal
  • Netherlands
  • Netherlands Antilles
  • New Caledonia
  • New Zealand
  • Nicaragua
  • Niger
  • Nigeria
  • Niue
  • Norfolk Island
  • North Macedonia
  • Northern Mariana Islands
  • Norway
  • Oman
  • Pakistan
  • Palau
  • Palestinian Authority
  • Panama
  • Papua New Guinea
  • Paraguay
  • Peru
  • Philippines
  • Pitcairn Islands
  • Poland
  • Portugal
  • Puerto Rico
  • Qatar
  • Reunion
  • Romania
  • Russia
  • Rwanda
  • Samoa
  • San Marino
  • Sao Tome and Principe
  • Saudi Arabia
  • Senegal
  • Serbia
  • Seychelles
  • Sierra Leone
  • Singapore
  • Slovakia
  • Slovenia
  • Solomon Islands
  • Somalia
  • South Africa
  • South Georgia and South Sandwich Islands
  • Spain
  • Sri Lanka
  • St. Martin (French part)
  • St.Helena
  • St.Kitts and Nevis
  • St.Lucia
  • St.Pierre and Miquelon
  • St.Vincent and the Grenadines
  • Sudan
  • Suriname
  • Svalbard and Jan Mayen
  • Swaziland
  • Sweden
  • Switzerland
  • Taiwan
  • Tajikistan
  • Tanzania
  • Thailand
  • Timor-Leste
  • Togo
  • Tokelau
  • Tonga
  • Trinidad and Tobago
  • Tristan da Cunha
  • Tunisia
  • Turkey
  • Turkmenistan
  • Turks and Caicos Islands
  • Tuvalu
  • Uganda
  • Ukraine
  • United Arab Emirates
  • United Kingdom
  • United States
  • United States Minor Outlying Islands
  • Uruguay
  • Uzbekistan
  • Vanuatu
  • Vatican City
  • Venezuela
  • Vietnam
  • Virgin Islands
  • Virgin Islands,British
  • Wallis and Futuna
  • Western Sahara
  • Yemen
  • Zambia
  • Zimbabwe
Request a quote
Request a quote

Solar Traffic Signal System Components: What to Specify

CASE SERIES / 02 — EQUIPMENT

Equipment supply for an African port project

What belongs in the equipment package—and what needs to be confirmed locally? A practical planning guide grounded in an African port project.

Project installation photograph showing traffic signal heads, a countdown display and a solar panel on the pole
Customer project photograph: signal heads, countdown display and solar panel during installation. Privacy retouching applied to faces and background identifiers. This is not a final-operation photograph.
PROJECT CONTEXTAfrican port
DELIVERY MODELSupply + local installation
EVIDENCECustomer project records

A solar traffic signal system is more than a signal head

For the African port project, our supply covered traffic signal lights, the control system, solar panels, batteries and related equipment. The local partner handled foundations, poles, installation and commissioning. When questions arose on site, we provided technical guidance.

This article introduces the products supplied for this project and the information needed when planning a similar system.

Products supplied for this project

  • 300 mm traffic signal lights
  • 100 mm traffic signal lights
  • 800 × 600 mm countdown displays
  • 300 mm countdown displays
  • 100 W solar panels
  • 65 Ah batteries
  • MPPT controllers
  • Wireless traffic control host units
The project is in operation according to project feedback. Available photographs document construction, assembly and testing.

Four equipment groups to discuss together

EQUIPMENT SCOPE / CONCEPTUAL OVERVIEW

One project.
Four equipment groups.

☀Solar panelsSolar power supply
▥BatteriesEnergy storage
▤Control systemSignal operation
●Traffic signalsRoad user indication
Conceptual equipment grouping based on the confirmed supply scope. Not a wiring diagram, product photograph or exact project configuration.
01 / SIGNALS

Traffic signal lights

Define the required signal functions, installation positions and mounting interfaces. A signal head should be selected in the context of the road layout and applicable project requirements.

Explore traffic signals →
02 / CONTROL

Control system

Describe the movements to be managed and the required operating sequence. Confirm compatibility between the controller and the proposed signal equipment before finalising the configuration.

Explore traffic controllers →
03 / SOLAR SUPPLY

Solar panels

Share the site location, mounting arrangement and potential shading. Panel selection needs to be assessed alongside the equipment load and local solar conditions.

04 / ENERGY STORAGE

Batteries

Confirm the operating schedule, expected backup requirement and installation environment. Battery selection should be reviewed together with the panel and control system configuration.

The product list above describes the supply scope of this project. Equipment configurations and interfaces for other projects need to be confirmed against their site conditions.

Connect the equipment scope to the local site

INTERFACE PLANNING

Where equipment meets the site

Supplied equipment

Signals
Control system
Solar panels and batteries

Confirm together

Mounting details
Connection documents
Installation responsibilities

Local implementation

Foundations and poles
Installation
Commissioning

Planning illustration. Responsibilities reflect this case; interface details require confirmation for each new project.

The planning illustration shows where equipment supply and local fabrication need to be discussed together. Signal heads and locally supplied pole components meet at physical mounting interfaces; power and control connections also need to be agreed.

01Road layout and signal functions
02Equipment configuration
03Pole and mounting interfaces
04Installation documents

For a new project, establish who will confirm mounting dimensions, cable routing, equipment connections and the relevant drawings. The sequence above is a suggested coordination framework, not an as-built diagram of this project.

Site records: equipment preparation and mounting

These two additional photographs come from the customer’s original project records. They show equipment preparation and pole-mounted equipment installation, providing context for coordination with the local team.

Equipment enclosures, cables and signal components during on-site preparation
Equipment and cable preparation on site. This photograph is not a wiring reference or evidence of a specific equipment model.
Workers installing pole-mounted equipment enclosures and brackets
Pole-mounted equipment and bracket installation. This records the site work, not an installation procedure for other projects.

What to include in a solar traffic light enquiry

A clear project brief helps turn a broad request for “solar traffic lights” into a discussion about an actual installation.

  • Location and application: country, site type and a basic road layout.
  • Signal requirements: proposed positions, directions and functions.
  • Power and operation: available supply, operating schedule and backup expectations.
  • Local scope: whether foundations, poles, cabling and installation are arranged locally.
  • Project requirements: relevant specifications, review requirements and target schedule.

If some details are still unknown, identify them in the enquiry. They can then be clarified before a configuration is proposed.

Questions before specifying equipment

Did the supplier also provide foundations and poles?

For this project, the local partner was responsible for foundations and poles. Our supply covered signal lights, the control system, solar panels, batteries and related equipment.

Can the same solar panel and battery configuration be reused elsewhere?

This project included 100 W solar panels and 65 Ah batteries. A new site still needs a separate assessment of equipment load, local solar conditions and backup requirements before selecting its configuration.

Where can I see the complete project story?

Read the African port project overview for the supply responsibilities and available site records.

YOUR NEXT PROJECT

Planning solar traffic signals for your site?

Send your site layout, equipment requirements and local installation scope. We can discuss the configuration and identify what still needs to be confirmed.

Discuss your project →

Related solution: Solar LED traffic lights

Comment

Name
Email
Comment